New Bathroom

Full Bathroom was completed recently unfortunately forgot to take any before photos. Removing a bath, freestanding basin and w/c. Fully stripping walls and floors of tiles before lowering waste pipe below the floor, allowing the new shower tray to be fitted on the floor. Build out the wall for a concealed shower valve and use some of that space to create a niche for all those gels and shampoo. Ceiling-mounted shower head with a wall-mounted handset. The walls fully tiled in a grey stone tile with black slate flooring. Before finishing with gloss white units, black accessories, black radiator and black bezel spotlights. Plastering by David Wake of D&L Plastering, Electrics by Rutherford and Clark and all products supplied by ShowerMania Cramlington Bathrooms & Tiles are well worth a visit for inspiration.

Leave a Reply